About: planned process   Goto Sponge  NotDistinct  Permalink

An Entity of Type : owl:Class, within Data Space : wasabi.inria.fr associated with source document(s)

AttributesValues
type
equivalentClass
label
  • planned process
subClassOf
topic
described by
term editor
  • Bjoern Peters
  • Bjoern Peters
example of usage
  • Injecting mice with a vaccine in order to test its efficacy
  • Injecting mice with a vaccine in order to test its efficacy
definition
  • A process that realizes a plan which is the concretization of a plan specification.
  • A processual entity that realizes a plan which is the concretization of a plan specification.
imported from
definition source
  • branch derived
  • branch derived
editor preferred term
  • planned process
  • planned process
  • planned process
has curation status
editor note
  • 'Plan' includes a future direction sense. That can be problematic if plans are changed during their execution. There are however implicit contingencies for protocols that an agent has in his mind that can be considered part of the plan, even if the agent didn't have them in mind before. Therefore, a planned process can diverge from what the agent would have said the plan was before executing it, by adjusting to problems encountered during execution (e.g. choosing another reagent with equivalent properties, if the originally planned one has run out.)
  • We are only considering successfully completed planned processes. A plan may be modified, and details added during execution. For a given planned process, the associated realized plan specification is the one encompassing all changes made during execution. This means that all processes in which an agent acts towards achieving some objectives is a planned process.
  • 'Plan' includes a future direction sense. That can be problematic if plans are changed during their execution. There are however implicit contingencies for protocols that an agent has in his mind that can be considered part of the plan, even if the agent didn't have them in mind before. Therefore, a planned process can diverge from what the agent would have said the plan was before executing it, by adjusting to problems encountered during execution (e.g. choosing another reagent with equivalent properties, if the originally planned one has run out.)
  • We are only considering successfully completed planned processes. A plan may be modified, and details added during execution. For a given planned process, the associated realized plan specification is the one encompassing all changes made during execution. This means that all processes in which an agent acts towards achieving some objectives is a planned process.
curator note
  • 6/11/9: Edited at workshop. Used to include: is initiated by an agent
  • This class merges the previously separated objective driven process and planned process, as they the separation proved hard to maintain. (1/22/09, branch call)
  • 6/11/9: Edited at workshop. Used to include: is initiated by an agent
Faceted Search & Find service v1.13.91 as of Mar 24 2020


Alternative Linked Data Documents: Sponger | ODE     Content Formats:       RDF       ODATA       Microdata      About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data]
OpenLink Virtuoso version 07.20.3229 as of Jul 10 2020, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (94 GB total memory)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software